YEAR OF START
|
TYPE OF WORK
|
|
2004
|
System design of a 2B-type controlled tip for the disposal of industrial waste resulting from the Enel Power Station in Portoscuso
|
|
2004
|
Permanent safety plan and environmental reclamation of the landfill "Sa Piramide" in the municipality of Portoscuso (CA)
|
|
2005
|
Construction works of the new road SS 125. Section Capo Boi - Terra Mala, 1st lot.
|
|
2005
|
Construction works of the new road SS 125. Section Capo Boi - Terra Mala, 1st lot.
|
|
2005
|
Securing of the area surrounding the Syndial plant of Assemini (CA)
|
|
2005
|
Adjustment of the SS131 trunk road and elimination of grade level crossings by Sanluri
|
|
2006
|
Adjustment of the SS131 trunk road and elimination of grade level crossings by Sanluri
|
|
2006-2007
|
Stockpile area and handling of coal inside the Thermal Power Plant Sulcis (CA), hired labour and rentals.
|
|
2007
|
Expansion of Red Mud waste basin - Sector 1C A1-B1 and ancillary works.
|
|
2007
|
Civil works for the permanent safety of the power stations in Sulcis territory.
|
|