Works Portfolio PDF Print E-mail

YEAR OF START

TYPE OF WORK

2004

System design of a 2B-type controlled tip for the disposal of industrial waste resulting from the Enel Power Station in Portoscuso

2004

Permanent safety plan and environmental reclamation of the landfill "Sa Piramide" in the municipality of Portoscuso (CA)

2005

Construction works of the new road SS 125. Section Capo Boi - Terra Mala, 1st lot.

2005

Construction works of the new road SS 125. Section Capo Boi - Terra Mala, 1st lot.

2005

Securing of the area surrounding the Syndial plant of Assemini (CA)

2005

Adjustment of the SS131 trunk road and elimination of grade level crossings by Sanluri

2006

Adjustment of the SS131 trunk road and elimination of grade level crossings by Sanluri

2006-2007

Stockpile area and handling of coal inside the Thermal Power Plant Sulcis (CA), hired labour and rentals.

2007

Expansion of Red Mud waste basin - Sector 1C A1-B1 and ancillary works.

2007

Civil works for the permanent safety of the power stations in Sulcis territory.